
| Quality Area | Questions to Ask |
| BOM | Is the approved BOM controlled? |
| Components | Are critical parts inspected on arrival? |
| Substitution | Are component changes controlled? |
| PCBA | Is the assembled PCB tested? |
| Assembly | Are production processes monitored? |
| Electrical | Are output and charging functions tested? |
| Safety | Are applicable safety tests performed? |
| Aging | Is burn-in used where appropriate? |
| Thermal | Is high-load temperature evaluated? |
| Final QC | Is the finished product inspected? |
| Traceability | Can production batches be identified? |
| Engineering changes | Are changes documented and validated? |
| Packaging | Are SKU, labeling and packaging checked? |
| Mass production | Is quality consistent between batches? |