Company News

USB-C Charger Source Power Testing AVS, DPS and Multi-Port Validation Explained

Views : 72
Author : News Department: Ken
Update time : 2026-11-13 14:21:59
USB-C Charger Source Power Testing AVS, DPS and Multi-Port Validation Explained

A USB-C charger can advertise the correct power profiles, complete PD negotiation, and still have problems when its output is tested under real operating conditions.
The issue is not always the maximum wattage. It may appear during a voltage transition, a sudden load change, a long-duration power request, or when several USB-C ports operate at the same time.
For charger manufacturers, this is why source power testing matters.
 
USB Power Delivery is not only about telling a connected device how much power a charger can provide. The source must also deliver that power within the required electrical limits, respond correctly to voltage and current requests, and maintain stable operation under the conditions defined by its design.
This has become more important as USB-C chargers move toward higher power levels and more advanced capabilities such as AVS and DPS.
 
On November 4, 2026, the USB Implementers Forum (USB-IF) issued Revision 1.2 of its USB Type-C and Power Delivery Source Power Requirements Compliance Test Specification. The update includes an AVS Voltage Step Test, a DPS Soak Test, and revisions to shared-capacity testing for multi-port products.
 
For charger engineers and OEM buyers, the update provides a useful reference for understanding how modern USB-C power sources are evaluated beyond their advertised output ratings.
This article explains the engineering purpose behind these tests and how a charger factory can use similar validation methods during product development.
 
What Is USB-C Charger Source Power Testing?
USB-C charger source power testing evaluates whether a charger can provide the electrical output it advertises and respond correctly to the connected device's power requests.
A USB-C charger acts as a power source. A phone, laptop, tablet, or other connected product acts as a power sink.
During USB Power Delivery negotiation, the charger communicates its available power capabilities. The connected device then requests an operating condition supported by both sides.
However, successful communication does not automatically prove that the power supply can maintain the requested output under every relevant condition.
 
A charger may advertise a 20V output profile, for example. Engineers still need to verify whether the output voltage remains within the required limits when the load changes, whether the source completes a voltage transition correctly, and whether its protection behavior is appropriate.
Source power testing therefore looks at several areas:
• Output voltage accuracy and stability
• Voltage transition behavior
• Current delivery and current limiting
• Response to load changes
• Overcurrent protection
• PPS and AVS operation
• Shared power behavior on multi-port chargers
• Long-duration operation under defined power conditions
The exact test requirements depend on the product's advertised capabilities and the applicable USB-IF test specification.
 
For an OEM project, the same engineering principle applies even when a particular product is not being submitted for USB-IF compliance testing: the source should be validated under the operating conditions stated in its specification.
 
What Changed in the USB-IF Source Power Test Specification Revision 1.2?
The November 2026 Revision 1.2 update is particularly relevant to chargers that support advanced USB Power Delivery functions.
According to the revision history, the update includes:
  1. Revised assertions associated with USB PD 3.2 Version 1.2.
  2. Updates to the SPT.8 Shared Capacity Test.
  3. A new SPT.9 AVS Voltage Step Test.
  4. Additional multiple-port testing conditions for SPT.6, SPT.7, SPT.8, and SPT.9.
  5. A new SPT.10 DPS Soak Test.
  6. Updated default tester settings and verification tags.
The important point is that the test specification is looking beyond whether a charger can establish a power contract.
It also examines how the source behaves after the contract has been established.
 
For example, AVS testing evaluates voltage changes across the advertised adjustable range. DPS testing checks whether a source maintains its reported power capability for the required test duration. Shared-capacity testing evaluates how the available power is managed when multiple ports are connected and loaded.
These are different engineering questions. A charger can perform well in one area and still need improvement in another.
The update should also be understood in the context of the existing USB Power Delivery protocol. It does not mean that every USB-C charger suddenly needs to support AVS or DPS. The relevant test applies to products that advertise the corresponding capabilities.
For background on the protocol generations, see our explanation of USB PD 3.0, PD 3.1, and PD 3.2.
 
Why Is AVS Voltage Transition Testing Important?
AVS stands for Adjustable Voltage Supply. It allows a compatible USB-C power source to provide adjustable voltage within an advertised operating range.
For the charger, supporting AVS means more than including an AVS-capable controller or displaying an AVS label in the product specification.
 
The power stage must respond correctly when the connected device requests a different voltage.
Consider a charger that advertises an AVS APDO. A compatible sink may request a voltage near the lower end of the supported range, then request a higher voltage, and later reduce it again.
The charger needs to complete each transition in a controlled manner.
 
Several problems can occur if the power stage or control loop is not properly designed:
• The output voltage may rise too quickly.
• The voltage may overshoot the permitted range.
• The output may take too long to settle.
• The charger may send PS_RDY before the output has reached the requested operating condition.
• The output may become unstable when the load changes during the voltage transition.
These issues may not appear during a basic fixed-voltage test.
That is why AVS requires a more detailed validation approach.
 
What Does the SPT.9 AVS Voltage Step Test Check?
The new SPT.9 test evaluates the source's response to a series of requested AVS voltage changes.
The test specification defines several voltage step sizes:
• 100mV; 500mV;
• 1V; 2.5V;
It also defines different operating-current conditions.
The tester requests voltage changes across the advertised AVS range and checks whether the source follows the requested transition correctly.
Among the key verification points are:
Voltage transition rate
The output voltage must change within the permitted positive or negative slew-rate limits.
A source should not change voltage too aggressively simply because the requested voltage is different.
 
Settling time
The output must settle within the required voltage tolerance by the applicable transition deadline.
A voltage transition that eventually reaches the correct value may still fail if it takes too long.
 
Overshoot and undershoot
The output must remain within the permitted valid range during the transition.
A brief voltage excursion should not be ignored simply because the final reading looks correct.
 
Voltage direction
During an increasing voltage request, the settled output should not unexpectedly move downward. During a decreasing request, it should not unexpectedly move upward.
 
PS_RDY timing
The source must send PS_RDY at the appropriate time, when the output has reached the required operating condition.
 
This is important because the communication message and the actual electrical behavior must agree.
The test specification also evaluates output behavior under different load conditions. In some test steps, the load is changed in increments while the source voltage is being evaluated.
This helps reveal problems that a simple no-load voltage measurement would miss.
 
Why Does AVS Need Testing at Different Current Levels?
A voltage transition under a light load is not necessarily equivalent to the same transition under a heavier load.
When output current increases, the power stage has to supply more energy. The behavior of the feedback loop, switching stage, output capacitors, and current-control system becomes more important.
For this reason, AVS validation should not be limited to one voltage and one current point.
A meaningful engineering program should consider:
• Minimum supported AVS voltage
• Maximum supported AVS voltage
• Intermediate voltage steps
• Low-current operation
• Representative higher-current operation
• Increasing and decreasing voltage requests
• Load changes during voltage transitions
For a charger manufacturer, the goal is to verify the actual advertised AVS operating range rather than test only the most convenient operating point.
 
What Is the Difference Between AVS Testing and PPS Testing?
AVS and PPS both support adjustable output voltage, but they are not interchangeable test categories.
PPS is part of the USB Power Delivery ecosystem and is commonly used in compatible smartphone and other charging applications.
 
AVS extends adjustable-voltage operation into the relevant higher-power USB-C PD use cases.
The engineering principle is similar: the source must follow the requested voltage and maintain the required output behavior.
However, their operating ranges, protocol requirements, and test parameters are different.
A charger that supports PPS does not automatically support AVS. Likewise, passing a PPS test does not establish that the charger has passed AVS voltage transition testing.
This distinction is important when a product specification lists multiple charging capabilities.
 
For example, a charger may support PD fixed PDOs and PPS but have no AVS APDO. Another charger may support PD, PPS, and AVS.
The factory should prepare its test plan according to the capabilities actually advertised by the product.
It should not assume that one adjustable-voltage test can replace all the others.
 
What Is the New DPS Soak Test?
DPS stands for Dynamic Power Source in the USB PD 3.2 specification.
The new SPT.10 DPS Soak Test focuses on whether a source can maintain its reported power capability for the required period under the defined test conditions.
This is different from simply checking whether the charger can briefly reach its maximum advertised power.
 
A charger may successfully establish a high-power contract during a short test. That alone does not demonstrate that the source can maintain the reported capability throughout the required operating period.
The DPS Soak Test addresses this distinction.
 
What Does SPT.10 Verify?
The test procedure begins by connecting the tester to a DPS-capable port and negotiating a default 5V contract.
The tester then requests the highest supported fixed PDO that meets the port's maximum power capability.
The test checks two main points:
  1. The source accepts the PD request and establishes the contract.
  2. The source maintains its reported Port PDP for the required tDpsColdStart duration.
The test specification identifies this as a required test for USB PD ports that set the DPS Port bit in the Source_Info Message SIDO 2.
The exact test duration is determined by the relevant USB PD specification parameter. It should not be replaced with an arbitrary number of minutes in a product marketing document.
 
Why Is Sustained Power Capability Important?
In practical charger development, sustained output and short-duration output are not the same thing.
A power supply may be capable of delivering a high output briefly, but its operating conditions can change as the system warms up.
Several factors can influence sustained performance:
Power-stage thermal behavior - Switching devices, transformers, rectifiers, and other components generate heat during operation. Their temperature affects the available operating margin.
Current and power limits - The controller, switching devices, transformer, and output components must support the intended operating point.
Protection settings - Overcurrent and overtemperature protection must be configured to protect the product without causing unnecessary interruptions during normal operation.
Component and assembly variation - Differences in magnetic components, semiconductor characteristics, soldering, and PCB assembly can influence the final product.
A DPS-capable charger therefore benefits from both electrical and thermal validation.
The objective is not merely to demonstrate that the charger reaches the advertised power once. It is to verify that it can maintain the reported capability under the specified test conditions.
 
How Does the Updated Shared Capacity Test Affect Multi-Port Chargers?
Multi-port charging products have another challenge: the available power may be shared between several USB-C ports.
The total output rating of a charger does not necessarily mean that every port can deliver that amount simultaneously.
 
For example, a 100W charger may provide 100W through one USB-C port when used alone. When a second device is connected, the available power may be redistributed according to the product's power-sharing design.
This is not automatically a defect.
The important issue is whether the charger advertises and manages its available power correctly.
The updated SPT.8 Shared Capacity Test evaluates the electrical and policy behavior of shared-capacity USB-C ports.
 
What Does SPT.8 Check?
The test examines whether the source can maintain the required output behavior as ports are connected, disconnected, and loaded.
Important verification areas include:
Correct power capability advertisement
The source should not advertise more power than is available to the port under the current shared-capacity condition.
 
Minimum port capability
The specification includes a minimum capability requirement for each individual USB Type-C port in a shared-capacity group.
 
Power availability updates
When the available shared power changes, the charger must communicate the updated capability to the relevant ports.
 
Power rebalancing
The charger must manage changes in available power through the defined USB Type-C and USB PD methods.
The test verifies that power rebalancing is completed without using Hard Reset, Error Recovery, or the Type-C Disabled state as a normal power-management method.
 
Output voltage behavior
The remaining connected ports must stay within the applicable voltage limits when another port changes its connection or power condition.
The test also checks the permitted voltage droop and recovery behavior.
 
Why Should Multi-Port Tests Include Different Connection Combinations?
Testing each port individually is not enough for a charger that supports shared power.
A product may perform correctly when one port is used but behave differently when several devices are connected.
For example:
• Port C1 is operating at a high-power contract.
• Port C2 is connected and requests additional power.
• The charger updates its available power.
• The existing contract may need to change.
The source must manage the transition without creating an unacceptable voltage disturbance on the other port.
The test plan should therefore include the actual port combinations supported by the product.
 
The updated specification also defines multiple test setups, including conditions where other ports are connected and loaded while the port under test is evaluated.
For a more consumer-oriented explanation of the power-sharing behavior, see why a 100W charger can drop to 65W when another device is connected.
The distinction is important: the previous article explains why power can be redistributed, while this article focuses on how the source behavior can be tested.
 
How Should a Charger Factory Build an AVS and DPS Validation Plan?
A charger factory does not need to treat the USB-IF compliance test as the only useful engineering reference.
The same principles can be incorporated into product development and pre-production validation.
For a charger that advertises AVS, DPS, or shared-capacity operation, a structured test plan should cover the following areas.
1. Confirm the Advertised Capabilities
Start with the approved product specification and USB PD capability information.
Confirm:
Supported fixed PDOs
• PPS APDO ranges, if supported
• AVS APDO ranges, if supported
• Maximum current and power
• DPS capability, if advertised
• Port power-sharing behavior
• Cable and operating limitations
The test plan must match the actual product configuration.
If a capability is not advertised, it should not be assumed to apply to the product.
 
2. Verify the PD Communication and Power Contract
Use a suitable USB PD analyzer or compliance test platform to check the negotiation sequence.
Confirm that the source advertises the correct capabilities, responds to requests appropriately, and establishes the expected power contract.
A successful communication log is useful, but it should be evaluated together with electrical measurements.
 
3. Measure Output Voltage During Transitions
Use an oscilloscope and suitable measurement setup to observe VBUS during voltage changes.
Record:
• Initial voltage
• Requested voltage
• Transition direction
• Voltage slew rate
• Overshoot or undershoot
• Settling time
• PS_RDY timing
The measurement should be performed at the appropriate output point and with a test arrangement suitable for the required bandwidth and electrical conditions.
 
4. Apply Controlled Load Changes
Use an electronic load or a suitable USB PD test platform to apply defined current conditions.
Do not rely only on a smartphone or laptop as the test load.
Consumer devices may change their charging demand according to battery state, temperature, workload, and their own power-management strategy.
A controlled test load makes it easier to reproduce the same operating condition.
 
5. Perform Sustained Output Testing
For DPS-capable products, verify the required reported power capability over the applicable test duration.
Record the output voltage, current, power, and relevant temperature conditions.
If the charger reduces output or activates protection, the engineering team should investigate the cause instead of treating the result as a simple pass or fail without context.
 
6. Test Multi-Port Combinations
For shared-capacity products, evaluate the relevant port combinations.
Connect and disconnect devices in controlled sequences. Monitor the output of the port under test and the behavior of the remaining connected ports.
The objective is to confirm that power redistribution follows the product's declared behavior and that the source maintains the required electrical limits.
 
7. Verify Thermal and Production Consistency
Electrical performance should be reviewed alongside temperature.
A charger that passes a short test may still require further evaluation under sustained operation.
The engineering team should also confirm that the validated configuration matches the production BOM, PCB, magnetic components, enclosure, and approved firmware or controller settings.
Changes to critical components should be reviewed and validated before being introduced into mass production.
 
Common Mistakes When Evaluating AVS and DPS Chargers
Some evaluation mistakes can make a charger appear better or worse than it actually is.
Checking only whether AVS appears in the product specification - An AVS label does not prove that the charger completes voltage transitions correctly. The actual output behavior needs to be measured.
Testing only one AVS voltage point - A charger may perform well at one requested voltage but show instability at another point in its advertised range. Voltage-step testing provides a more complete view.
Treating successful PD negotiation as proof of output performance - The communication layer and power stage have different responsibilities. Both need to be evaluated.
Confusing short-duration output with sustained power capability - A brief high-power reading does not prove that a DPS-capable source maintains its reported capability for the required duration.
Testing multi-port chargers one port at a time only - This can miss problems caused by power sharing, contract changes, and output interaction between ports.
Using consumer devices as the only test equipment - Phones and laptops do not provide fully controlled load conditions. They are useful for compatibility testing, but they should not replace electronic loads and appropriate PD test equipment.
Failing to document the test conditions - A test report should identify the product configuration, input conditions, requested power profile, load, equipment, and acceptance criteria.
Without this information, it is difficult to reproduce the result or compare different product versions.
 
What Should OEM Buyers Ask a Charger Manufacturer?
For brands and distributors sourcing AVS or DPS chargers, the most useful questions are about actual performance and test evidence.
Before approving a new product, consider asking:
  1. Which USB PD fixed PDOs and adjustable APDOs does the charger advertise?
  2. Does the product support AVS, PPS, DPS, or a combination of these functions?
  3. Has the AVS output been evaluated across the advertised voltage range?
4. Are voltage transition, settling, and PS_RDY behaviors included in the engineering test plan?
5. Has the DPS power capability been checked under the applicable sustained test conditions?
6. For multi-port products, have the relevant shared-capacity combinations been evaluated?
7. Can the manufacturer provide test records for output voltage, current, power, and temperature?
8. Does the mass-production configuration match the configuration used for engineering validation?
 
For an OEM project, these questions are more useful than simply asking whether the charger supports PD 3.2.
A professional charger manufacturer should be able to explain the product's actual capabilities, operating limits, and validation process.
 
Final Thoughts: A USB-C Power Rating Needs Engineering Evidence
USB-C charger development is moving beyond fixed output ratings and basic PD negotiation.
AVS, DPS, and multi-port power management introduce additional operating conditions that need to be evaluated at the source.
The November 2026 USB-IF Source Power Test Specification Revision 1.2 provides a useful reference for this work. Its updated shared-capacity testing, AVS voltage-step testing, and new DPS soak test highlight the importance of checking how a charger behaves after a power contract has been established.
 
For manufacturers, the practical lesson is straightforward: a charger should be evaluated across the capabilities it advertises, not only at one convenient output point.
For OEM buyers, the value of a product specification increases when it is supported by documented engineering validation.
 
ZONSAN is a charger-focused manufacturer with 16 years of industry experience and a 5,143㎡ production facility. Our engineering and manufacturing capabilities support OEM and ODM projects involving USB-C PD, PPS, AVS, GaN, and multi-port fast chargers.
When developing a new USB-C charger, defining the required power profiles, port configuration, target market, and validation conditions early helps the engineering team select the right architecture and prepare a more reliable product for mass production.
 
Frequently Asked Questions
Q1: What is USB-C charger source power testing?
USB-C charger source power testing evaluates whether a charger can deliver its advertised output capabilities and respond correctly to USB Power Delivery requests. It can include voltage transitions, current delivery, load changes, protection behavior, and multi-port operation.
 
Q2: What changed in the USB-IF Source Power Test Specification Revision 1.2?
The November 2026 revision added an AVS Voltage Step Test and a DPS Soak Test, updated shared-capacity testing, and introduced additional multiple-port testing conditions for several test procedures.
 
Q3: What is the SPT.9 AVS Voltage Step Test?
SPT.9 evaluates how an AVS-capable source responds to requested voltage changes. It checks voltage transition rate, settling behavior, valid voltage limits, load response, and PS_RDY timing.
 
Q4: What is the SPT.10 DPS Soak Test?
SPT.10 checks whether a DPS-capable USB PD source can maintain its reported Port Power Data capability for the required test duration after establishing the specified power contract.
 
Q5: Does every USB-C charger need AVS testing?
No. The SPT.9 AVS test applies to USB PD ports that advertise AVS APDO capabilities. A charger that does not advertise AVS does not automatically require that particular AVS test.
 
Q6: Is AVS testing the same as PPS testing?
No. AVS and PPS are different adjustable-voltage capabilities within USB Power Delivery. They have different operating parameters and test requirements. Passing a PPS test does not automatically establish AVS performance.
 
Q7: Why do multi-port chargers need shared-capacity testing?
A shared-capacity charger may redistribute available power when devices connect or disconnect. Testing helps verify that the source advertises available power correctly, manages power changes through the defined methods, and maintains the required output behavior on connected ports.
 
Q8: Can a charger pass PD negotiation but fail source power testing?
Yes. A charger may communicate correctly and establish a PD contract but still have problems with voltage stability, transition timing, current delivery, sustained power, or multi-port behavior.
 
Q9: What equipment is used for USB-C source power testing?
A suitable test setup may include a USB PD protocol analyzer or compliance test platform, programmable electronic loads, an oscilloscope, voltage and current probes, and temperature measurement equipment. The exact equipment depends on the test being performed.
 
Q10: What should OEM buyers request when sourcing an AVS or DPS charger?
Buyers should request the advertised PD capabilities, AVS and DPS test information where applicable, voltage-transition results, sustained-output evidence, multi-port test records, and confirmation that the validated configuration matches the mass-production product.

 
Newsletter